Bugs wait at the bottom of the backlog
Customer reports sit behind the next feature for weeks. The customer who filed one is still waiting, and usually tells someone.
A bug that waits a quarter at the bottom of Jira costs you the customer who reported it. So does a surprise cloud bill, an unpatched library or a framework two major versions behind. We run maintenance as a stream of its own: an AI pipeline that triages bugs and drafts fixes, with an engineer approving every plan and every merge. Upgrades run on a schedule, security patches go out as advisories land, and someone watches the cloud bill and the alerts. Your team keeps the roadmap. You see what was fixed, how it was tested and what still needs your call.


Customer reports sit behind the next feature for weeks. The customer who filed one is still waiting, and usually tells someone.
The framework is two major versions behind, the runtime is close to end of life and every dependency bump feels like a gamble. So nobody touches it.
The bill grows every month, monitoring wakes someone at 2am and security advisories pile up in an inbox nobody reads.
The developer who built it moved on, or is the last one left who understands it. Every change waits for them.
Agents triage the report, reproduce it, plan the fix, build it and run the tests. An engineer approves every plan and merges every pull request. Nothing merges on its own. In our own factory week the line ran 50 tickets at about $2.90 each in inference. A bug gets worked on this week, not when a sprint frees up.
Each fix is checked on the changed behavior and the paths nearby, and the regression suite grows with it. Repeated reports often point to a deeper problem, so we record the pattern and agree with you which root fixes go into the stream.
Renovate or Dependabot opens the update, CI runs your tests, an agent fixes what the upgrade broke and an engineer reviews the merge. Dependencies, frameworks and runtimes move in small steps, so no upgrade turns into a migration project.
Attackers have the same new models we do, and they use them to find weak spots faster. We patch known vulnerabilities as advisories land, scan dependencies and code, and check permissions, secrets and exposed endpoints. Fixes go through the same gates as every other change.
We watch the bill and the alerts on AWS, Azure, GCP or wherever the product runs: idle resources, oversized instances, noisy alerts and the errors users hit first. Each month you get a short list of what to cut and what to fix.
Documentation, runbooks and tests live in your repo, and tickets stay in your tracker. With that context, AI coding agents and any motivated engineer can pick up the code. Changes still get reviewed, but the product no longer depends on the one veteran who remembers why it works.
Work follows the release schedule agreed with your team
A person approves the plan before implementation
A person reviews the pull request and test results before merging
On-call coverage and response times require a separate written agreement

The repository, the tracker and the documentation
Your cloud accounts and the bill
The priorities of the maintenance stream
Decisions on root fixes and bigger changes
Give maintenance its own line
Our own product, PirxeyOS, took about twenty working days to build. Then 150 people moved onto it, and 52% of the commits after go-live were fixes. Across its log the fixes fall into four groups: 51 for data consistency, 35 for real devices and screens, 31 for permissions and security, 26 for APIs and integrations. Shipping starts the work. We plan for those groups instead of discovering them one ticket at a time.
Integrations change, regulations change, products change, architecture evolves. Build it. Document it. Maintain it. Collect data. Optimize. There’s just no other way.

Ticket history, release schedule, cloud accounts, how far behind the dependencies are and the areas that break most often. You get the first risks and what we need before we take responsibility.

We connect the fix pipeline to your tracker and CI, and write down who approves plans and merges, which reports are urgent, the upgrade schedule and who watches alerts. On-call coverage and new features are separate decisions.

Agents draft, engineers decide. Every fix, upgrade and patch goes through your review and your pipeline, with regression tests for the changed behavior and the paths nearby.

What came in, what was fixed and how fast, which upgrades and patches shipped, what the cloud bill did and which patterns to fix at the root. Task-level time records show where the hours went.


Balance support tickets, regressions and testing in your team's week and compare six months with a maintenance stream of its own.
Read the briefOur own product took about 20 working days to build. Across its whole commit log, 46% of 587 commits were fixes.
Read the briefAssemble an agent production line yourself and see where the people have to stand: 50 tickets in a week, two human gates, $2.90 a ticket.
Read the briefTell us about the product and who uses it, how many tickets arrive, how often you release, where it runs and how far behind the upgrades are.
Mike KacprowiczBook a callChief Growth Officer